Designer: Paula Ables
Construction: Skelly Build
A whole house renovation is a special project, and this Barton Creek Canyons Home deserved two blogs to cover its spectacular transformation. If you haven’t caught Part 1, you can do so here:
Today, let’s take a look at all SIX bathroom renovations done in this house. That’s right, six bathrooms. Five inside the house and one out by the pool. Let’s kick it off with the master bath:
Master Bath:
The master bathroom got a full gut. We replaced the existing cabinetry with custom-built cabinetry including a newly painted and sealed floating double vanity with shelving for hair styling tools. The same countertops used in the kitchen were also used for the master bath. We completed new framing to relocate the master bathroom door. Instead of entering directly into the middle of the master bedroom, we relocated the pocket doors to the side of the bedroom.
Electrically, we lit each focal point of the bathroom with backlighting and light fixtures. Next, we transformed the current tub area into the shower, tiled it from floor to ceiling, and also installed tile on the relocated tub wall, backsplash, and behind the shelving. Behind the tub, we replaced the old window with a ribbon window to add privacy and more natural lighting. Finally, we installed all accent hardware to finish the look off.